Attention information

List of attention information is this

List of urgent information is this

The citizen top > Work, industry > Bid, contract information > About observance of a contract, inspection of contract > The handling to affect exclusive duty of engineer of construction

It is the text from here.

Update day: December 15, 2015

The handling to affect exclusive duty of engineer of construction

Because increase of the number of ordering of construction is anticipated in this city with growth strategy for Japanese economy reproduction of country, for smooth ordering of construction, we will tell as we arranged the handling of exception.

Construction to accept additional post of full-time chief engineer in 1 construction

About construction to meet all of requirements to advocate next, we do additional post of full-time chief engineer with the handling to admit.

  • It is specified that construction condition books can hold an additional post by construction of Nasu-Shiobara-shi ordering
  • Doing number of construction that we include construction to assume exclusive duty characteristics requirements and can hold an additional post of with to 2, and which construction being below 50 million yen in amount of contract price.

Construction to relax resident duty of 2 spot agents

About construction to meet all of requirements to advocate next, we relax resident duty of spot agent and do additional post of the plural construction spots with the handling to admit.

  • It is specified that construction condition books can hold an additional post by construction of Nasu-Shiobara-shi ordering
  • It being said that number of the construction spot that we can hold an additional post of is to 2, and both construction being below 50 million yen in amount of contract price.
  • You shall reside in either construction spot to hold an additional post of by all means and reside without deflection.
  • Being admitted that administration, the control, safety management in the construction spot do not have trouble.

Procedure of additional post at the time of 3 bid participation qualification requirements confirmation

It is said that procedures that person of order should perform in the case of bid participation qualification requirements confirmation are as follows.

  • When we are going to let you hold an additional post of spot agent of construction that became successful bid candidate or spot agent with construction precedent for chief engineer or chief engineer, (except case of additional post only for chief engineer who is not exclusive duty) must receive approval after discussion by construction meeting book about additional post with member of supervision of precedent construction.
  • You must submit copy of construction meeting book that listed discussion result as confirmation documents of being construction that chief engineer or spot agent can hold an additional post of concerned in conjunction with documents of subsequent examination
  • About construction that you knocked down other than the general competitive bidding more, you must submit copy of construction meeting book that listed discussion result in the case of contract presentation.

 

Cancellation of 4 contracts

Without making a contract when we are going to locate at the time of at the time of the real contract conclusion or the start of construction for contract term of works, and chief engineer or thing that we are going to locate, and spot agent cannot hold the posts of the ordering construction concerned and became clear after successful bid decision or person of ordering may cancel contract by rule of the contract contract Article 47 Clause 1 third. In this case, even if the damage occurs to successful bidder;, as for the person of ordering,; do not hold itself responsible.

To download page of Adobe Reader

When you see file of Portable Document Format, Adobe Reader is necessary. Please download one that does not have Adobe Reader free from link of banner.

Contact

Position section room: General affairs department contract inspection section 

Phone number 0287-62-7114

Fax number: 0287-62-7184

Tell opinion of all of you to have better website

Was information of this page useful?

Was it easy to find information of this page?